Rhine Post Delivery
We load self-propelled vehicles at our Rhine loading station located at PK 241,200 of the channelled Rhine.
The materials are destined for the European market (Germany, Belgium, Netherlands). Our cargo capacity is in the range of 600 to 700 tons per hour.
——————————————————————————————————————————————————————————————————————————-
Regional delivery
We can transport our materials regionally by truck using a fleet of:
- 6 30-ton payload semi-trailer trucks.
- 1 6×4 truck with 14 tons of payload.
That ensure the supply of our customers (BPE power plant, prefa plants, public works sites, individuals, …).
All of our vehicles are equipped with an electric longitudinal bottling/debugging system.
——————————————————————————————————————————————————————————————————————————-
Central concrete delivery
We also have a tank for the supply of concrete power plants. The payload is 30 tons.
——————————————————————————————————————————————————————————————————————————-
Loading ramp
A loading ramp has been set up to facilitate the loading of “higher” grain-type dumpsters.